Land for sale in Bang Len, Nakhon Pathom, owner selling it himself.

Land for sale in Bang Lane by owner, land in Nakhon Pathom, land for sale in Nakhon Pathom, cheap land in Nakhon Pathom, land in Bang Len, Nakhon Pathom, Bang Len Airport, Nakhon Pathom, Motorway Bang Yai, Kanchanaburi

Sell ​​by owner All plots are on a concrete road, width 60 meters. The road is well lit on both sides, 2-wheel vehicles can park together comfortably opposite the PTT gas station. Call & Line 18

There are many sizes of land. 8,500 per square wa

  1. Size 3 rai 2 ngan 118 square wa. The width of the concrete road is 211.97 meters, behind the irrigation canal.
  2. Size 4 rai 1 ngan 99.6 square wah, width of the concrete road 53.6 meters
  3. Size 4 rai 1 ngan 99.5 square wah, width of the concrete road 56.52 meters
  4. Size 13 rai 0 ngan 62.2 square wah, width of the concrete road 54.31 meters
  5. Size 26 rai 1 ngan 24 square wa. The width of the concrete road is 107.90 meters.
  6. Size 40 rai, width of concrete road 163.11 meters
Please enable JavaScript in your browser to complete this form.
Broker / Buy it yourself
The land is only far away. 15 minutes from Bang Yai – Kanchanaburi Motorway, use Nakhon Chai Si Checkpoint.

Adjoining projects are under construction.

Adjoining land is being developed into a house by the lake.
The land next to the project is being developed at Lamae Panpee, a lake house.
Adjoining land is being developed into a house by the lake. luxury
15 minutes to the new airport Nakhon Pathom Airport

factory near the land

The ready-made factory is also on Road 3038, Ariyaland Project, entering from 346, distance 15 kilometers.

18-wheel trailer is comfortable.
Factory near another land

Land entrance from Road 346

Ezzo pump, entrance to the front of the land
Ezzo pump, entrance to the front of the land
S__5062730
PTT gas station opposite the entrance to the land
346 Road, Bang Len, Pathum Thani, entrance to the land
346 Road, Bang Len, Pathum Thani, entrance to the land
Lampposts along the entrance to the land
Lampposts along the entrance to the land
8 meters of road in front of the land, every plot is connected to 8 meters of concrete road
Road 12 meters in front of the land, every plot is on a concrete road
S__5062693
Where can I go from the land? The sign is clearly in front of the land.
All plots, stakes, clear, neat, all plots surveyed, all plots are correct.
Every plot, embroidered with poles, clear, complete, all plots surveyed have a legal deed

Tourism in Bang Len District and Nakhon Pathom

The land in front of the concrete road 12 meters behind the canal. The most beautiful land, square shape.

The width is 60 meters. The land is a beautiful rectangular shape. good concrete road

At the entrance there is a large PTT gas station.

The entrance has a lamp post. Turn on the bright light in a straight line.

2.7 kilometers from road 346 or 30 minutes from Salaya

Very suitable for building factories, warehouses, very comfortable.

The road in front of the land, 18-wheel trailers can run comfortably. The garden is chilling.

near air orchid The largest orchid garden in the country

There is an industrial estate nearby, selling 15 million per rai.

There is a village no more than 1 km.

In the future, there will be Nakhon Pathom Airport, Nakhon Chai Si, only 10 minutes.

Motorway Bang Yai, Kanchanaburi, travel only 20 minutes, completed in 2566

nearby places

10 minutes, Bang Len Airport, Nakhon Pathom, completed in 68
7 kilometers from the motorway, Bang Yai, Kanchanaburi, Ban Phu Nam Ron, completed in 66
30 minutes from Central Gateway + Bang Yai BTS Purple Line
10 minutes from Salaya Transport
15 minutes from Nopphawong intersection Bang Yai-Suphan Buri Road from Noppawong
20 minutes Phutthamonthon Sai 4, Mahidol Salaya
Motorway Chonburi, Saraburi, Nakhon Pathom M92
Outer Ring Road, Bangkok Round 3 M91
Bang Len next to 3 provinces, Bangkok, Nonthaburi, Pathum Thani, 40 minutes into the heart of Bangkok.

 

Land Bang Len, Nakhon Pathom

Big plot of land in the future Motorway Bang Yai - Kanchanaburi Signed a contract for 9 episodes, expected to be completed in '63
The construction of the special highway No. 81, Bang Yai - Kanchanaburi, a distance of 96 kilometers, has been started, with an investment budget of 49,120 million baht. is 9 episodes, the rest is expected to be able to complete the signing by December 25.
After signing the contract, the contractor will be able to start construction immediately according to the planned plan. Each contract takes no more than 30 months to complete on average. and is scheduled to be completed in 2563

For the construction of the special highway No. 81, Bang Yai - Kanchanaburi route is a special highway. That will allow traffic from Bangkok and its vicinity to easily travel to the western part of the country. And will be an important infrastructure that connects production bases and exports of neighboring countries in the west as well. (Connecting the transportation network to the western region and Dawei Deep Sea Port Project, Burma)

The route of the said motorway covers an area of ​​4 provinces, namely Nonthaburi, Nakhon Pathom, Ratchaburi and Kanchanaburi, with its starting point at Bang Yai Interchange, Bang Yai District, Nonthaburi Province. and ends at Highway 324, Muang District, Kanchanaburi Province Construction cost 43,700 million baht, expropriation cost 5,420 million baht
The format of the project is a special highway that collects toll fees as a closed system along the route, with 4-6 traffic lanes, with a width of 50 meters, 70 meters, 90 meters, and 100 meters.
There are also 3 highway service areas, namely 1 Rest Area (approx. 71 km.) and 2 Service Areas (approx. 20 km. and 47 km.)

Intercity motorway or motorway Bang Yai - Kanchanaburi route (Highway No. 81) The Department of Highways (Highway) has divided the construction contract into 25 episodes or 25 contracts worth more than 5.5 billion baht. Recently, 7 contracts have been signed with contractors. The rest will accelerate the signing. The contract will be completed by the end of this year. Therefore, it will begin to see the entry of the construction area during the year 2560 onwards, taking a construction period of 2-3 years. Currently, it is in the process of accelerating the expropriation payment before accelerating the delivery of the area to each contractor for operation.

"Bang Yai - Kanchanaburi motorway" is another route that has been certified for safe road use. There is complete control of entrances and exits. systematically connect to the network contributes to the economic development of the central region Western region and country overview Save travel time and costs, thereby reducing fuel consumption and maintenance costs. In addition to reducing transportation costs, which will lead to the elevation of Thailand's trade competitiveness.

The route begins at the Bang Yai Interchange, Bang Yai District, Nonthaburi Province, and passes through Phutthamonthon District, Nakhon Chai Si District, Mueang Nakhon Pathom District, Nakhon Pathom Province, Ban Pong District, Ratchaburi Province, Tha Maka District, Kanchanaburi Province. Ends at Tha Muang District, Kanchanaburi Province, a total distance of 96 kilometers.

For the route pattern, there are 4-6 traffic lanes (round-trip), both elevated and flat. The pattern of interchanges along the route and there are a total of 8 toll plazas as follows: Bang Yai interchange (Highway No. 9 and Highway No. 302 intersection) Nakhon Chai Si Interchange (Highway No. 3323 intersection) Nakhon Chai Si Level Junction (Special highway intersection No. 91 or motorway Nakhon Pathom - Cha-am) East Nakhon Pathom intersection (Highway No. 3036 intersection) Nakhon Pathom intersection on the west side (Highway Intersection No. 321) Tha Maka Interchange (Highway Intersection No. 3394) Tha Muang Interchange (Highway No. 3081 intersection) and Kanchanaburi Interchange (Highway No. 324 convergence point).

There will be 2 total service areas near the Nakhon Pathom West Interchange. and close to the Nakhon Chai Si intersection There is also one roadside accommodation located between the Tha Muang interchange and the Tha Maka interchange that will provide motorists with a comfortable and safe journey, especially for long-distance users to rest and relax. tired from driving

Please wait a little longer! With the delivery of the construction acceleration area to all 25 contracts before moving on to speed up the construction to be completed quickly to help stimulate the economy in the western region. and the central region to link with the Dawei deep sea port construction project supported by the Thai government in Myanmar. open trade doors with neighboring countries like Myanmar via the Bang Yai - Kanchanaburi motorway soon

There are 8 interchanges, namely:
1) Bangyai
2) Nakhon Chai Si (Tor Lor. 3323)
3) Nakhon Chai Si (Connecting Nakhon Pathom - Cha Am)
4) Eastern Nakhon Pathom (Tor Lor. 3036)
5) Nakhon Pathom on the west side (Thor Lor. 321)
6) Tha Maka (Tor Lor. 3394)
7) Tha Muang (TorLor.3081)
8) Kanchanaburi (Tor Lor. 324)

From the 36th edition of the economic base newspaper, issue 3,198, dated 6 – 8 October 2559.

Daily house in Pattaya next to the sea https://baanpyntalay.com

Guesthouse Khao Yai, Talay Mok https://khaoyai.online/

Fortune Cookie https://fortunecookie.site/

Call Now Button